BoDo constructor project required a very thorough research and several iterations already at the concept stage due to the very high requirements for load capacity, draught and a very precise process of laying the cable at the seabed while maintaining full autonomy of the unit. Elements of jack up, mooring and anchoring systems have been combined to create a unique system for moving the object. Today, the vessel works very effectively in the North Sea and German coastal waters, being an important source of income for the shipowner.

Mr. Jerzy Pietrzak, Technical Director

OUR OWN DESIGNS
SEE VIDEO PRESENTATIONS AND LEAFLETS
CLICK TO OPEN GALLERY
BoDo Constructor
CABLE-LAYING BARGE
CUSTOMER
Bohlen&Doyen GmbH
LOA
120.27 m
CARGO DECK LOAD
15 T / m2
DEADWEIGHT
9264 T
MAIN PURPOSE
laying cables in the seabed, serving as a logistic base for installation of offshore wind farms in the Northern Sea
BREADTH
32.00 m
DEPTH TO MAIN DECK
6.60 m
DRAUGHT
3.50 m
PROPULSION
main engines – 3 x Mitsubishi S12R-MPTAW, 4 x azimuth thrusters with Dynamic Positioning System
ACOMMODATION
crew - 50 persons
CABLE CAPACITY
Deadweight - 9264 T
Cargo deck load -15 T / m2
Cargo Deck Area - 2196 / m2
Cable capacity - 30 km (5000 T)
CLICK TO OPEN GALLERY
Wind Constructor
JACK-UP WINDFARM INSTALLATION VESSEL
CUSTOMER
TBA
LOA
186.50 m
CARGO DECK LOAD
15 T / m2
DWT LIFTING
15000 mT
MAIN PURPOSE
transport and installation of offshore wind farms on waters up to 80 m of depth
The main intention of the proposed concept of the Windfarm Installation Vessel was to reduce ship length and to obtain the optimal DWT lifting capacity.
BREADTH
56.00 m
DEPTH TO MAIN DECK
11.60 m
DRAUGHT
5.50 m
PROPULSION
Aziumth stern thrusters at aft – 3 x 3000kW,
Bow retractable aziumth thursters – 2 x 3000kW,
Bow thruster – 1 x 3000kW,
Diesel generators – 6 x 4000kW
ACOMMODATION
crew – 50 persons
CARGO
DWT lifting – abt. 15000 mT,
Cargo deck load – 15 T / m2,
Cargo Deck Area – 6200 m2,
Main crane – 1600 mT at 87 m outreach,
Auxiliary cranes – 2 x 15 mT at 25 m outreach
INSTALLATIONS
CARGO "A" – MONOPILE INSTALLATION:
Monopiles: 5 x 80x8 m (2000 T each),
Skid kard: 300 T,
Upending tool: 150 T,
Pile gripper frame: 400 T,
Storage cradles: 1000 T,
Hydrohummer: 400 T,
Noise mitigation: 400 T,
Lifting tool: 100 T.
CARGO "B" - TOWERS INSTALLATION:
Towers: 6 x 1000 T,
Nacelle: 6 x 4500 T, Blades: 19 x 100 T,
Lifting tool for towers: 10 T,
Lifting tool for nacelle: 10 T,
Lifting tool for blades: 120 T,
Storage grid for blades: 120 T,
Securing outfit: 100 T.
CARGO "C" - JACKETS INSTALLATION:
Jackets: 4 x 1500 T,
Grillage / Rigging: 4 x 100 T,
Other equipment: 1500 T.
CLICK TO OPEN GALLERY
Trimor
RESEARCH VESSEL
CUSTOMER
Gdańsk Maritime Institute
LOA
55.58 m
CARGO DECK AREA
300 m2
ENDURANCE
21 days (30 persons)
MAIN PURPOSE
carrying and operating research equipment, enabling scientists to work onboard
Trimor is designed and equipped for:
  • performing bird and mammal observation, operation of the system for acoustic observation of the presence of marine mammals (C-POD),
  • measuring wind masts during the period of measurements at fixed locations,
  • issuing and service of buoys and super-buoys (measuring up to 10 T + up to 30 T of the necessary equipment) for measuring hydrometeorological conditions,
  • bathymetric and geophysical measurements for the needs of wind farm construction, using built-in or mobile measuring equipment mounted on board, in the hull or towed behind the ship's stern or along ship's sides,
  • being the carrier and base ship for at least 3 autonomous AUVs (Autonomous Underwater Vehicles) with the necessary equipment (2 x 20' containers for each AUV) and a joint launching and lifting system (LARS), weighing approx. 30 T in total,
  • being the carrier and base ship for 2 remotely controlled undersea drills (Portable Remotely Operated Drills) with the necessary equipment (3 x 20' containers) and a joint launching and lifting system (LARS), weighing approx. 140 T in total,
  • carrying the remotely controlled medium-sized underwater ROV vehicle with the necessary equipment (2 x 20' containers), weighing approx. 12-16 T in total,
  • carrying the CPT device with the necessary equipment, weighing approx. 3-10 T in total,
  • carrying the Vibrating Probe VKG-3/6 with the necessary equipment, weighing approx. 2 T in total.
BREADTH
19.60 m
DEPTH TO MAIN DECK
6.00 m
DRAUGHT
3.00 m
PROPULSION
main engine – 630 kW / 1500 rpm,
side engines – 315 kW / 1500 rpm,
propellers – 3 x azimuth thursters,
speed max. – 14 kn
ACOMMODATION
crew – 18 persons,
scientists – 12 persons
CARGO CAPACITY
Deadweight – 300 T
Cargo capacity – 180 T
Workshop – 80 m2
Hold capacity – 190 m2
Containers capacity – 9 pcs, 8 T each
Cargo deck – 300 m3
SPECIAL EQUIPMENT
built-in bathymetric and geophysical measurement devices,
3 x Autonomous Underwater Vehicles - AUVs (length: 5200 mm, diameter: 720 mm, weight: 1 T each),
2 x Portable Remotely Operated Drills (weight: 12 T each),
1 x medium-sized underwater ROV vehicle (weight: 1 T),
1 x CPT device (weight: 3-10 T),
1 x Vibrating Probe VKG-3/6
OTHER PROJECTS
project name
unit type
customer
scope of the project
Type 187 Sietas Werft
Pella Sietas
Detail Design package - design support at JJ Sietas,
RELATED CASE STUDIES

By specialists, for specialists

We believe that a synergy between the designers and the investor, and the end user leads to a successful design. Our cooperation with Gdańsk Maritime Institute lead to the conception of TRIMOR – a functional and reliable research vessel.